Euston Station

Main Contractor: Morgan Sindall
Location: London, UK

The Task

During a phased refurbishment after the London 2012 Olympics, in conjunction with the roof system manufacturer IKO PLC and the contractor, we were asked to assist in specification for the roof works of the project.

The Solution

Rooflock recommended and supplied a large number of products for the refurbishment of the 46,000m² roof of Euston Station, including over 130 flat roofing outlets and over 10000 lightning protection clips.